Kadıköy, Istanbul · Dilovası plant & warehouse · London office +90 216 545 60 00
Omega Steel Co.Steel supplier · Turkey

Steel export to Iraq — ports, documents, transit time

Iraq is our largest truck market: hollow sections, H beams, galvanized pipe, sandwich panels and trapezoidal sheet for reconstruction and oil-field camps move weekly through Habur. Trucks load in Dilovası on Monday and clear Habur on Wednesday or Thursday.

Last updated

Ports and routes

Umm Qasr (Basra) · Habur / Ibrahim Khalil border (truck) · Erbil

Transit time

4–6 days by truck via Habur to Erbil, Mosul, Baghdad; 18–22 days sea to Umm Qasr

Incoterms we quote

DAP Erbil / Baghdad by truck; CIF Umm Qasr

Documents and certificates

COC (certificate of conformity) by an approved inspection body for most steel HS codes, certificate of origin, commercial invoice, packing list; Kurdistan Region: separate customs clearance at Habur

Payment, duty and loading

Two customs territories, one country

An Iraqi order has to state which authority will clear it before anything else is discussed. The Kurdistan Region administers its own customs at Ibrahim Khalil and the federal government administers the rest, and the documents, the duty and the inspection regime differ between them.

For Erbil, Duhok and Sulaymaniyah, goods cross overland at Habur/Ibrahim Khalil after a road run of roughly three to five days from Dilovası. For Baghdad, Basra and the south, the route is either the long overland leg through federal crossings or sea to Umm Qasr via the Gulf, at roughly fifteen to twenty days.

Quoting a single delivered price for Iraq without naming the crossing is how orders go wrong.

Conformity certificate before shipment, not after

Federal Iraq operates a pre-shipment conformity programme: the consignment is inspected and a certificate of conformity issued in the country of export, and material arriving without it faces delay, penalty or rejection at the border. The inspection is arranged before loading, against the standard named in the contract.

That single requirement drives the lead time on an Iraqi order more than production does. We build the inspection window into the schedule and name the standard on the proforma, so the certificate matches what actually ships rather than what was originally quoted.

  • Name the standard on the purchase order — EN, ASTM or an Iraqi specification — because the certificate is issued against it.
  • Changes to size or grade after inspection invalidate the certificate; a re-inspection costs a week.
  • The Kurdistan Region applies its own regime; confirm which one applies before booking the inspection.
  • Mill certificates to EN 10204 3.1 are supplied with every consignment regardless of the inspection route.

Payment and the practical realities of the route

Letters of credit through Iraqi banks are workable and slow; advance payment or a mix of advance and balance against documents is more common on trade-sized orders. Whichever is used, the terms should be fixed before the conformity inspection is booked, because an inspection against an unconfirmed order is money spent on a shipment that may not move.

On the road leg, transit time varies with border queues rather than with distance, and a three-day run can become six in a busy week. For project material with a fixed installation date we plan the delivery to arrive early and stage it locally rather than timing it to the day.

What moves well into Iraq

  • Sandwich panel and trapezoidal sheet for warehouses, poultry houses and labour accommodation.
  • Hollow sections, purlins and light frames for pre-engineered buildings.
  • Galvanized pipe for water and structural use, in bundled truck loads.
  • Rebar-adjacent structural sections and plate for fabrication shops in Erbil and Sulaymaniyah.
  • Guardrail systems and posts for road contracts.

Frequently asked questions

How long does delivery from Turkey to Iraq take?

Three to five days by truck to Erbil, Duhok or Sulaymaniyah via the Habur/Ibrahim Khalil crossing, and roughly fifteen to twenty days by sea to Umm Qasr for Basra and the south. Border queues move these figures more than distance does.

Is a conformity certificate required for steel into Iraq?

For federal Iraq, yes — a pre-shipment inspection and certificate of conformity issued in the country of export, against the standard named in the contract. The Kurdistan Region administers its own regime, so the destination has to be confirmed before the inspection is booked.

Can you deliver to Erbil by truck?

Yes, DAP Erbil by truck is the most common term we ship on, typically three to five days from Dilovası. Baghdad and the south are usually quoted either as a longer overland run or CIF Umm Qasr.

What payment terms apply for Iraq?

Letters of credit through Iraqi banks work but are slow; advance payment, or advance plus balance against documents, is more common on trade-sized orders. Terms should be agreed before the conformity inspection is booked.

Products most ordered from Iraq

Request a landed price

Tell us the product, quantity and destination; we reply with a CIF/DAP price, gross weight, container count and the certificate cost for Iraq.

Quotations go through WhatsApp. Send the grade, size, quantity and destination and we price it the same working day.

Request a quotation on WhatsApp

One tap, no form and no account. Drawings, cutting lists and DXF files can go straight into the chat.